• Alfords Point
  • Alfords Point Road between Brushwood Drive and Georges River Bridge
SCHEDULED ROAD WORKS Resurfacing
 
Thu 16 Feb 2017 - Tue 14 Mar 2017
 
Scheduled lane closures for this week.
Every night (9.30pm to 5am) Both directions affected
 
Advice:
Check signage
Allow extra travel time
A contra flow is in place during work time to provide one lane of traffic in each direction.
Top
Help | Contact Us | Terms of Use
Mobile Site | Full Site
Roads and Maritime Services NSW ©2017